In our last post, we mentioned that we hit a delay because of our windows. Well, the window guys showed up again this week, and started back to work. He hopes to be done in the next week or two. So, things are progressing again.

In the meantime, there’s been a lot happening with woodwork and cabinetry, counters, plumbing, and electrical. The aluminum guys are mostly done; still a few more pieces to finish up.

We now have electricity, water, internet, and we’re connected to the town sewer.

We’re sooooo close to being finished. Soon!

Front aluminum gates are in place

Major bummer about all of the cables running across the front of the house. 😖

Front door; waiting on the handle
View once you walk in the front door
Living room
Living and dining
Kitchen
Kitchen
View from the master bedroom terrace
Master bedroom
Master bath and closet
Master bath. Shower on the left; toilet room on the right
Master closet
View from the kitchen
Pool area
View from upstairs
Cafe area
Upstairs guest bathroom
Front terrace
Elizabeth’s Office

Top floor terrace
Equipment bodega