It’s been way too long since I posted an update; there’s been a lot of progress, and we’re actually nearing the finish line.

The celosias (breeze blocks) are all in, and looking great.
  • All of the concrete work is done; just needs final finishing
  • Almost all of the tile is in, expect for a bit with the bathrooms
  • Glass windows and doors have started going in, should be finished up in the next week or so
  • Drywall ceilings are all in; ready for lighting, speakers, and WiFi access points
  • The carpenters are ready with the cabinetry, just waiting for the window guys to finish up

View from the kitchen
Master Bedroom
The pool, and to the right of the pool is the outdoor grill/kitchen area
The glass is onsite, and installation is in-progress
Stairs will be polished concrete (for the first half level), and then wood beyond that
Tile “rug” on one of the terraces
Tile “rug” on the top terrace
Shower in the master bath; wall showerhead and a ceiling rain shower
Bodega in the backyard. The lower half is for the generator