2nd Concrete Pour for the new house

2nd Concrete Pour for the new house

Today the concrete pumper truck was back and poured the concrete for the top floor! It’s super cool to watch – and even cooler that we’re making good progress! This is the floor of the top level The openings will be an offset skylight. Hard to...
We have a second floor!

We have a second floor!

The second floor of our new house construction is happening! The ceiling of the 2nd floor is is partially done as well. Hola! View from the back bedroom down to the pool Looking down into the living room View from Gary’s offce There will be a pool here. So much...